Pipe Joint

Pipe Manufacturing

Hydro-Testing
Kharafi Steel has added another dimension to its capabilities by venturing in the field of shop fabricated pipe work in 1995.

The company bagged a single largest contract of fabricating C.W. pipeline for the Sabiya Power Station Project. The total weight of this fabrication work was 3,000 Tons and diameters varying between 0.4 m and 2.4 m. The job included complete hydro-testing of pipes and fittings to international standards. The work was completed in record time.

Keeping in mind the excellent performance on the above project, Kharafi Steel was awarded another project fabricating 3.5 KM of KOC pipeline having a diameter of 0.9 m.

 

 
Copyright © 2003 Khalid Ali Al Kharafi & Brothers Co. All Rights Reserved.
Designed by: